PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

3) Ice on Site at Footing H1 (3).JPG 4) Inside Formwork for Foundation Wall at Col Line 2.5.JPG 5) Slip Form Prep (2).JPG 6) Fire at Auto Body Shop.JPG 7)Fire at Auto Body Shop (2).JPG 8) Fire at Auto Body Shop (3).JPG
Previous pageNext page 7)Fire at Auto Body Shop (2)
7)Fire at Auto Body Shop (2)